Industrial Project Logistics
SUCCESSFUL CASES
1.Name:Equipment Transportation Gypsum Powder Production Line
Intro:Gypsum power assembly line with the Annual output 150,000 tons from Qingdao China to Novorossiysk ,Russia. GNL acted as the general coordinator to supervise logistic of all suppliers.
Remark:4x40’FR & 3x40’OT & 2x40’HQ & 8x40’GP.
Executive time:Jan.2010
2.Name:Factory Moving—exact machinery production line lifting
Intro:GNL worked as logistic provider.The project was the whole factory moving .The cargo include 6 automobile fitting lines ,products ,work equipment and factory corresponding supplementary equipments.
Service include :equipment measurement ,packing,loading,binding and land carriage etc.
Executive time:Oct.2008
3.Name:MALAYSIAN ALUMINUM MANUFACTURER PROJECT
Intro:8000Mt BUILDING MATERIALS from Guangzhou port to Bintulu by break bulk vessel .
Remark: 8000 Mt
Executive time:Aug.2008
4.Name :SEMICONDUCTOR PRODUCTION LINE BONDED MOVING PROJECT
Intro: GNL took charge in providing the service include : Precision machinery packing,load and transport,binding ,unloading and taking place.
Executive time: July.2007
5.Name:CERAMICS PRODUCTION EQUIPMENT EXPORTATION PROJECT
Intro:From Jan of 2009 Gnl began the project of ceramics production equipment lines .The first set is 3 sets of ceramics production equipment lines be exported from Shanghai to Bandar abbas by break bulk and ro/ro vessle.
Executive time: Jan.2009 till now
6.Name:TRACTORS EXPORTING PROJECT
Intro:GNL took charge in the exporting project from Shanghai to Algiers by break bulk and ro/ro vessel.
7.Name: Air port equipment transportation
Intro: 2 sets of PBB from China to India Door to Door
Executive time: Jan.2010
|